Article Metadata only M24
2018
Mining and Metallurgy Engineering Bor
1-2
37
44
English
M24 - Paper in a national journal of international significance
10.5937/mmeb1802037K
2334-8836
| dc.rights.license | ARR |
|---|---|
| dc.identifier.doi | 10.5937/mmeb1802037K |
| dc.identifier.uri | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2018/2334-88361802037K.pdf |
| dc.identifier.uri | https://repozitorijum.tfbor.bg.ac.rs/handle/123456789/579 |
| dc.language.iso | en |
| dc.source | Mining and Metallurgy Engineering Bor |
| dc.title | Selection of the optimum pushbacks in a long-term planning process of the open pit – a condition for maximization the Net Present Value. Case study: the open pit Veliki Krivelj, Serbia |
| dc.type | article |
| dc.type.version | publishedVersion |
| dc.citation.volume | 1-2 |
| dc.citation.spage | 37 |
| dc.rights.uri | https://en.wikipedia.org/wiki/All_rights_reserved |
| dc.citation.epage | 44 |
| dc.citation.rank | M24 |
| dc.creator | Krzanovic, Daniel |
| dc.creator | Vušović, Nenad |
| dc.creator | Ljubojev, Milenko |
| dc.date.accessioned | 2023-12-25T21:32:33Z |
| dc.date.available | 2023-12-25T21:32:33Z |
| dc.date.issued | 2018 |
| dc.identifier.issn | 2334-8836 |
| Selection of the optimum pushbacks in a long-term planning process of the open pit – a condition for maximization the Net Present Value. Case study: the open pit Veliki Krivelj, Serbia | 2 |
|---|